Japanese Knotweed - FAST System Case Study

Location: West London

 

Site - Development Site in West London

Planning - Construction of new apartments and regeneration of existing building.

Problem - Site contaminated with Japanese knotweed, main stand located off site, adjacent to public highway.

IVM Solution - Treat both on and off site japanese knotweed using the IVM 'FAST' System, which fully guaranteed eradication. No soil needed to leave site, no root barrier system was required, both passing cost savings to the client.

The treatment is fully guaranteed by IVM.

The images of the site below are taken throughout the treatment program, starting in July, then August and finally December.

 

Knotweed west LondonJapanese KNotweed west londonknotweed treatment west london

 

 

 

 

 

 

 

 

 